NOGRR #287 · Revision Request

NOGRR287  Load Shed Provisions to Identify and Minimize Overlap of Essential Loads

Pending sponsor ERCOT posted 2026-04-22 next Revision Request Consideration (TAC) ercot.com
ReasonRegulatory requirements
Created2026-05-07
Sections Affected
4.5.3.4 and 8L
Summary
This Nodal Operating Guide Revision Request (NOGRR) establishes guidelines for Transmission Operators (TOs) and Transmission and/or Distribution Service Providers (TDSPs) to collaborate in identifying and prioritizing critical natural gas infrastructure Loads essential for the reliability of the ERCOT System. Furthermore, this NOGRR outlines provisions for TOs and TDSPs to minimize overlaps between circuits designated for manual Load shedding, Under-Voltage Load Shedding (UVLS), and Under-Frequency Load Shedding (UFLS), and those circuits identified as critical Loads necessary for maintaining reliability of the ERCOT System.
Action Log 2 milestones
Amendments
DateBodyMotionResult
Jun 4 '26ROS to endorse and forward to TAC the 5/7/26 ROS Report, as amended by the 6/1/26 ERCOT comments, and the 4/22/26 Impact Analysis for NOGRR287Passed
Ballots
DateBodyResultYesNoAbstain
Jun 4 '26 ROS Motion Carries 7.5 0 0 xls
May 7 '26 ROS Motion Carries 7.5 0 0 xls
Documents 7
NameTypePostedClassification
287NOGRR-01 Load Shed Provisions to Identify and Minimize Overlap of Essential Loads 042226 docx Apr 22 '26 Revision Request
287NOGRR-02 Impact Analysis 042226 docx Apr 22 '26 Staff Report
287NOGRR-03 ROS Ballot 050726 xls May 11 '26 Revision Request Ballot
287NOGRR-04 ROS Report 050726 docx May 11 '26 Committee Report
287NOGRR-05 ERCOT Comments 060126 docx Jun 1 '26 Revision Request Comments
287NOGRR-06 ROS Ballot 060426 xls Jun 8 '26 Revision Request Ballot
287NOGRR-07 ROS Report 060426 docx Jun 8 '26 Committee Report
Meetings That Took It Up 2
DateMeetingCommitteeStatus
Jun 4 '26 ROS Meeting ROS Concluded
May 7 '26 ROS Meeting ROS Concluded