NOGRR #252 · Revision Request
NOGRR252 Related to NPRR1176, Update to EEA Trigger Levels
- ROS Jul 6 '23
- TAC Jul 25 '23
- BOARD Aug 31 '23
- PUCT Oct 12 '23
ReasonAddresses current operational issues
Created2023-06-08
Approved2023-10-12
Sections Affected
4.2.24.5.3and 4.5.3.1
Summary
This Nodal Operating Guide Revision Request (NOGRR) aligns Nodal Operating Guide language with NPRR1176, which revises the Energy Emergency Alert (EEA) procedures to require a declaration of EEA Level 3 when Physical Responsive Capability (PRC) cannot be maintained above 1,500 MW and will require ERCOT to shed firm Load to recover 1,500 MW of reserves within 30 minutes, modifies the trigger levels for EEA Level 1 and EEA Level 2, changes the trigger for ERCOT’s consideration of alternative transmission ratings or configurations from Advisory to Watch when PRC drops below 3,000 MW, and restores a frequency trigger for the declaration of EEA Level 3 if the steady-state frequency drops below 59.8 Hz for any period of time.
Timeline
- Apr 25
-
May 18
Listed without action at 1 meeting
-
Jun 8
ROS ROS MeetingROSRecommended for Approval“to recommend approval of NOGRR252 as submitted” — Passed→ Impact Analysis Consideration
-
Jul 6
ROS ROS Meeting - Webex OnlyROSRecommended for Approval Forwarded → TAC“to endorse and forward to TAC the 6/8/23 ROS Report and 4/25/23 Impact Analysis for NOGRR252” — Passed→ Revision Request Consideration
-
Jul 25
TAC TAC Meeting - Webex OnlyTACRecommended for Approval“to recommend approval of NOGRR252 as recommended by ROS in the 7/6/23 ROS Report” — Passed→ Revision Request Consideration
-
Aug 31
BOARD Board of Directors MeetingBOARDRecommended for Approval“to recommend approval of NOGRR252 as recommended by TAC in the 7/25/23 TAC Report” — Passed→ Revision Request Consideration
-
Oct 12
PUCTPUCTApproved“to approve NOGRR252 and accompanying ERCOT Market Impact Statement as presented in Project No. 54445, Review of Rules Adopted by the Independent Organization” — Passed
-
—
Posted since the last meeting