NOGRR #247 · Revision Request
NOGRR247 Change UFLS Stages and Load Relief Amounts
ReasonAddresses current operational issues
Created2023-03-02
Approved2023-10-12
Sections Affected
2.6.1
Summary
This Nodal Operating Guide Revision Request (NOGRR) modifies the ERCOT automatic Under-Frequency Load Shed (UFLS) program by increasing the number of Load shed stages from three to five and changing the Transmission Operator (TO) Load relief amounts to uniformly increment by 5% for each stage. The NOGRR also adds a UFLS minimum time delay of six cycles (0.1 seconds), and adds 59.1 Hz to the list of UFLS stages in paragraph (3) of Section 2.6.1. Additionally, this NOGRR revises the grey-box language from NOGRR226 in Section 2.6.1 to provide that the TO Load value used to determine the TO Load at each frequency threshold in Table 1 will be the value of TO Load at the time frequency reaches 59.5 Hz, rather than the value of TO Load at the time of reaching each successive frequency threshold, consistent with the current method for determining TO Load in Table 1, and proposes an effective date of October 1, 2026 for both NOGRR226 and NOGRR247.
Action Log 6 milestones
-
Mar 2
ROSDeferred/Tabled→ ROS for consideration
-
Jun 8
ROSRecommended for Approval→ ROS for Impact Analysis for consideration
-
Jul 6
ROSRecommended for Approval→ TAC for consideration
-
Jul 25
TACRecommended for Approval→ Board for consideration
-
Aug 31
BOARDRecommended for Approval→ PUCT for consideration
-
Oct 12
PUCTApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Jun 8 '23 | ROS | To recommend approval of NOGRR247 as amended by the 4/27/23 CenterPoint Energy comments. | Passed |
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Jul 25 '23 | TAC | Motion Passes | 30 | 0 | 0 | xls |
| Jul 6 '23 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Jun 8 '23 | ROS | Motion Carries | 7.5 | 0 | 1 | xls |
| Mar 2 '23 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 14
| Name | Type | Posted | Classification |
|---|---|---|---|
| 247NOGRR-01 Change UFLS Stages and Load Relief Amounts 021523 | docx | Feb 15 '23 | Revision Request |
| 247NOGRR-02 Impact Analysis 021523 | docx | Feb 15 '23 | Staff Report |
| 247NOGRR-03 ROS Ballot 030223 | xls | Mar 3 '23 | Revision Request Ballot |
| 247NOGRR-04 ROS Report 030223 | docx | Mar 3 '23 | Committee Report |
| 247NOGRR-05 Oncor Comments 042523 | docx | Apr 25 '23 | Revision Request Comments |
| 247NOGRR-06 CenterPoint Energy Comments 042723 | docx | Apr 27 '23 | Revision Request Comments |
| 247NOGRR-07 ROS Ballot 060823 | xls | Jun 9 '23 | Revision Request Ballot |
| 247NOGRR-08 ROS Report 060823 | docx | Jun 9 '23 | Committee Report |
| 247NOGRR-09 ROS Ballot 070623 | xls | Jul 7 '23 | Revision Request Ballot |
| 247NOGRR-10 ROS Report 070623 | docx | Jul 7 '23 | Committee Report |
| 247NOGRR-11 TAC Ballot 072523 | xls | Jul 27 '23 | Revision Request Ballot |
| 247NOGRR-12 TAC Report 072523 | docx | Jul 27 '23 | Committee Report |
| 247NOGRR-13 Board Report 083123 | docx | Sep 1 '23 | Committee Report |
| 247NOGRR-14 PUCT Report 101223 | docx | Oct 13 '23 | Committee Report |
Meetings That Took It Up 11
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Aug 31 '23 | Board of Directors Meeting | BOARD | Concluded |
| Jul 25 '23 | TAC Meeting - Webex Only | TAC | Concluded |
| Jul 6 '23 | ROS Meeting - Webex Only | ROS | Concluded |
| Jun 8 '23 | ROS Meeting | ROS | Concluded |
| May 18 '23 | OWG Meeting - Webex Only | OWG | Concluded |
| May 4 '23 | ROS Meeting - Webex Only | ROS | Concluded |
| Apr 20 '23 | OWG Meeting - Webex Only | OWG | Concluded |
| Apr 6 '23 | ROS Meeting | ROS | Concluded |
| Mar 22 '23 | PDCWG Meeting | PDCWG | Concluded |
| Mar 16 '23 | OWG Meeting - Webex Only | OWG | Concluded |
| Mar 2 '23 | ROS Meeting | ROS | Concluded |