NOGRR #247 · Revision Request

NOGRR247  Change UFLS Stages and Load Relief Amounts

Approved sponsor ERCOT posted 2023-02-15 ercot.com
ReasonAddresses current operational issues
Created2023-03-02
Approved2023-10-12
Sections Affected
2.6.1
Summary
This Nodal Operating Guide Revision Request (NOGRR) modifies the ERCOT automatic Under-Frequency Load Shed (UFLS) program by increasing the number of Load shed stages from three to five and changing the Transmission Operator (TO) Load relief amounts to uniformly increment by 5% for each stage. The NOGRR also adds a UFLS minimum time delay of six cycles (0.1 seconds), and adds 59.1 Hz to the list of UFLS stages in paragraph (3) of Section 2.6.1. Additionally, this NOGRR revises the grey-box language from NOGRR226 in Section 2.6.1 to provide that the TO Load value used to determine the TO Load at each frequency threshold in Table 1 will be the value of TO Load at the time frequency reaches 59.5 Hz, rather than the value of TO Load at the time of reaching each successive frequency threshold, consistent with the current method for determining TO Load in Table 1, and proposes an effective date of October 1, 2026 for both NOGRR226 and NOGRR247.
Action Log 6 milestones
Amendments
DateBodyMotionResult
Jun 8 '23ROS To recommend approval of NOGRR247 as amended by the 4/27/23 CenterPoint Energy comments.Passed
Ballots
DateBodyResultYesNoAbstain
Jul 25 '23 TAC Motion Passes 30 0 0 xls
Jul 6 '23 ROS Motion Carries 7.5 0 0 xls
Jun 8 '23 ROS Motion Carries 7.5 0 1 xls
Mar 2 '23 ROS Motion Carries 7.5 0 0 xls
Documents 14
NameTypePostedClassification
247NOGRR-01 Change UFLS Stages and Load Relief Amounts 021523 docx Feb 15 '23 Revision Request
247NOGRR-02 Impact Analysis 021523 docx Feb 15 '23 Staff Report
247NOGRR-03 ROS Ballot 030223 xls Mar 3 '23 Revision Request Ballot
247NOGRR-04 ROS Report 030223 docx Mar 3 '23 Committee Report
247NOGRR-05 Oncor Comments 042523 docx Apr 25 '23 Revision Request Comments
247NOGRR-06 CenterPoint Energy Comments 042723 docx Apr 27 '23 Revision Request Comments
247NOGRR-07 ROS Ballot 060823 xls Jun 9 '23 Revision Request Ballot
247NOGRR-08 ROS Report 060823 docx Jun 9 '23 Committee Report
247NOGRR-09 ROS Ballot 070623 xls Jul 7 '23 Revision Request Ballot
247NOGRR-10 ROS Report 070623 docx Jul 7 '23 Committee Report
247NOGRR-11 TAC Ballot 072523 xls Jul 27 '23 Revision Request Ballot
247NOGRR-12 TAC Report 072523 docx Jul 27 '23 Committee Report
247NOGRR-13 Board Report 083123 docx Sep 1 '23 Committee Report
247NOGRR-14 PUCT Report 101223 docx Oct 13 '23 Committee Report
Meetings That Took It Up 11
DateMeetingCommitteeStatus
Aug 31 '23 Board of Directors Meeting BOARD Concluded
Jul 25 '23 TAC Meeting - Webex Only TAC Concluded
Jul 6 '23 ROS Meeting - Webex Only ROS Concluded
Jun 8 '23 ROS Meeting ROS Concluded
May 18 '23 OWG Meeting - Webex Only OWG Concluded
May 4 '23 ROS Meeting - Webex Only ROS Concluded
Apr 20 '23 OWG Meeting - Webex Only OWG Concluded
Apr 6 '23 ROS Meeting ROS Concluded
Mar 22 '23 PDCWG Meeting PDCWG Concluded
Mar 16 '23 OWG Meeting - Webex Only OWG Concluded
Mar 2 '23 ROS Meeting ROS Concluded