NOGRR #214 · Revision Request
NOGRR214 Geomagnetic Disturbance (GMD) Measurement Data Reporting
- ROS Sep 3 '20
- TAC Sep 23 '20
- BOARD —
- PUCT —
ReasonRegulatory requirements
Created2020-06-04
Sections Affected
6.1.16.1.5.1 (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) describes the process for ERCOT to collect Geomagnetically-Induced Current (GIC) monitor and magnetometer data to satisfy Requirements R11 and R12 of North American Electric Reliability Corporation (NERC) Reliability Standard TPL-007-3, Transmission System Planned Performance for Geomagnetic Disturbance Events.
Timeline
- May 20
-
Jun 4
ROS ROS MeetingROSDeferred/Tabled Referred → PGDTF“to table NOGRR214 and refer the issue to the Planning Geomagnetic Disturbance Task Force (PGDTF)” — Passed→ Language Consideration
- Jul 7
-
Jul 9
Listed without action at 1 meeting
-
Aug 6
ROS ROS MeetingROSRecommended for Approval Amended by the Jul 7 '20 PGDTF comments“to recommend approval of NOGRR214 as amended by the 7/7/20 PGDTF comments” — Passed→ Impact Analysis Consideration
-
Sep 3
ROS ROS MeetingROSRecommended for Approval Forwarded → TAC“to endorse and forward to TAC the 8/6/20 ROS Report and the Impact Analysis for NOGRR214” — Passed→ Revision Request Consideration
-
Sep 23
TAC TAC Meeting by Webex OnlyTACApproved Amended by the Sep 3 '20 TAC comments“to approve NOGRR214 as recommended by ROS in the 9/3/20 ROS Report as revised by TAC” — Passed
-
—
Posted since the last meeting