NOGRR #165 · Revision Request
NOGRR165 Emergency Operations Plans as Required by NERC Reliability Standards
- ROS Jan 12 '17
- TAC Jan 26 '17
- BOARD —
- PUCT —
ReasonRegulatory requirements
Created2016-11-17
Sections Affected
3.7Section 8 Attachment L (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) aligns the Operating Guides with North American Electric Reliability Corporation (NERC) Reliability Standards to ensure ERCOT, along with each Transmission Operator (TO), develops emergency operations plan(s) to mitigate operating emergencies. The emergency operations plan is intended to address NERC Reliability Standard EOP-011, Emergency Operations Planning, requirements and does not require Black Start or Geomagnetic Disturbance (GMD) plans to be included, as those requirements are addressed elsewhere in the Nodal Operating Guides.
Timeline
-
Aug 21
Listed without action at 1 meeting
- Oct 12
-
Oct 20
Listed without action at 2 meetings (Oct 20 '16 – Nov 8 '16)
-
Nov 17
OWG OWG MeetingOWGRecommended for Approval Amended by the OWG comments“To recommend approval of NOGRR165 as revised by OWG.” — Passed→ Impact Analysis Consideration
-
Dec 16
OWG OWG MeetingOWGRecommended for Approval Forwarded → ROS“To endorse and forward to ROS the 11/17/16 OWG Report and Impact Analysis for NOGRR165.” — Passed→ Revision Request Consideration
-
Jan 12
ROS ROS MeetingROSRecommended for Approval“To recommend approval of NOGRR165 as recommended by OWG in the 12/16/16 OWG Report.” — Passed→ Revision Request Consideration
-
Jan 26
TAC TAC MeetingTACApproved“To approve NOGRR165 as recommended by ROS in the 1/12/17 ROS Report.” — Passed
- Feb 2
-
May 18
Listed without action at 2 meetings (May 18 '17 – Jun 28 '17)