NOGRR #152 · Revision Request
NOGRR152 Restore Synchrony Between Contingency Planning for Minimum Level of Responsive Reserve Service and Real Time Contingency Analysis
ReasonAddresses current operational issues and restores alignment between the contingency planning for the minimum level of RRS and the transmission security analysis in RTCA that has been inadvertently lost as capacity upgrades were made to STP that are not captured in the RRS analysis. This alignment has become more important as the percentage of generation on the system that does not contribute with governor-like Primary Frequency Response can be in excess of 10,000 MW even during Summer peak conditons.
Created2016-01-26
Rejected2016-04-07
Sections Affected
2.3.1.1
Summary
Align consideration of the simultaneous loss of the South Texas Nuclear Project (STP) as a credible single contingency for purposes of determining the minimum amount of Responsive Reserve (RRS) as it is currently used in the Real-Time Contingency Analysis (RTCA).
Action Log 4 milestones
-
Jan 26
OWGDeferred/Tabled→ Language Consideration
-
Feb 18
OWGDeferred/Tabled→ Language Consideration
-
Mar 24
OWGDeferred/Tabled→ Revision Request Consideration
-
Apr 7
ROSRejected
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Apr 7 '16 | ROS | Motion Carries | 5.5 | 2 | 2 | xls |
Documents 8
| Name | Type | Posted | Classification |
|---|---|---|---|
| 152NOGRR-01 Restore Synchrony Between Contingency Planning for Minimum Level of Responsive Reserve Service and Real Time Contingency Analysis 010616 | doc | Jan 6 '16 | Revision Request |
| 152NOGRR-02 OWG Report 012616 | doc | Jan 29 '16 | Committee Report |
| 152NOGRR-03 ERCOT Comments 021716 | doc | Feb 17 '16 | Revision Request Comments |
| 152NOGRR-04 OWG Report 021816 | doc | Feb 19 '16 | Committee Report |
| 152NOGRR-05 ERCOT Comments 032316 | doc | Mar 23 '16 | Revision Request Comments |
| 152NOGRR-06 OWG Report 032416 | doc | Mar 28 '16 | Committee Report |
| 152NOGRR-07 ROS Report 040716 | doc | Apr 8 '16 | Committee Report |
| 152NOGRR-08 ROS Voting Ballot 040716 | xls | Apr 8 '16 | Revision Request Ballot |
Meetings That Took It Up 4
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Apr 7 '16 | ROS Meeting | ROS | Concluded |
| Mar 24 '16 | OWG Meeting | OWG | Concluded |
| Feb 18 '16 | OWG Meeting | OWG | Concluded |
| Jan 26 '16 | OWG Meeting | OWG | Concluded |