ERCOT·WATCH Search ercot.com  ⌕
NOGRR #109 · Revision Request

NOGRR109  Revisions to Definition of Credible Single Contingency for Operations Planning

Approved sponsor Operations Working Group (OWG) posted 2013-03-05 ercot.com
ReasonThe original intent of this NOGRR was to respond to the 2/14/13 ROS directive to the Operations Working Group (OWG) and based on the recommendation of the Operations and Planning Synchronization Task Force (OPSTF) regarding Issue 6 of the OPSTF Issues List Matrix, which relates to the "[u]se of double circuit contingencies to develop operating limits." The OPSTF recommendation is as follows: "OPSTF discussed a proposal that a DCKT outage be considered only if it caused a reliability problem. The 'push-back' was that it is hard for the market to model contingencies that are sometimes run and sometimes not. ERCOT commented that this would be complex, burdensome and require new tools for System Operations. OPSTF recommends that ROS direct OWG to modify the Operating Guides language (pg. 1-15) to better reflect the actual practice." After further review, the OWG has agreed to delete the definition of Credit Single Contingency from the Nodal Operating Guides. The definition will be incorporated in the Protocols as the use of the term is being introduced in Nodal Protocol Revision Request (NPRR) 540, Clarification of Credible Single Contingency.
Created2013-03-20
Sections Affected
1.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) deletes the definition of Credible Single Contingency from the Operating Guides.
Action Log 8 milestones
Amendments
DateBodyMotionResult
Mar 20 '13OWG Consensus to recommend approval of NOGRR109 as revised by OWG
Jun 19 '13OWG To recommend approval of NOGRR109 as amended by the 6/14/13 CenterPoint Energy comments and as revised by OWG.
Documents 11
NameTypePostedClassification
109NOGRR-01 Revisions to Definition of Credible Single Contingen doc Mar 5 '13 Revision Request
109NOGRR-02 OWG Report 032013 doc Mar 25 '13 Committee Report
109NOGRR-03 Impact Analysis 040813 doc Apr 8 '13 Staff Report
109NOGRR-04 OWG Report 041713 doc Jun 17 '13 Committee Report
109NOGRR-05 ROS Report 061313 doc Jun 17 '13 Committee Report
109NOGRR-06 CenterPoint Energy Comments 061413 doc Jun 14 '13 Revision Request Comments
109NOGRR-07 OWG Report 061913 doc Jun 21 '13 Committee Report
109NOGRR-08 ROS Report 071113 doc Jul 15 '13 Committee Report
109NOGRR-09 ROS Report 091213 doc Sep 16 '13 Committee Report
109NOGRR-10 TAC Report 100313 doc Oct 4 '13 Committee Report
109NOGRR-11 TAC Report 012814 doc Jan 30 '14 Committee Report
Meetings That Took It Up 11
DateMeetingCommitteeStatus
Jan 28 '14 TAC Meeting TAC Concluded
Oct 3 '13 Technical Advisory Committee (TAC) Meeting TAC Concluded
Sep 12 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Sep 6 '13 Workshop - Constraint Management Plan Revision Requests Concluded
Sep 3 '13 Workshop - Constraint Management Plan Revision Requests Concluded
Aug 15 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Jul 11 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Jun 19 '13 Operations Working Group (OWG) Meetings OWG Concluded
Jun 13 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Apr 17 '13 Operations Working Group (OWG) Meetings OWG Concluded
Mar 20 '13 Operations Working Group (OWG) Meeting OWG Concluded