NOGRR #75 · Revision Request

NOGRR075  Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI

Rejected sponsor APX Power Markets posted 2011-05-19 ercot.com
ReasonTo synchronize the Nodal Operating Guides with NPRR363.
Created2011-06-15
Rejected2011-08-11
Sections Affected
4.5.3.3
Summary
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI, which adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B.
Action Log 3 milestones
Documents 5
NameTypePostedClassification
075NOGRR-01 Synchronization with NPRR363, Revision to EEA Level doc May 18 '11 Revision Request
075NOGRR-02 ERCOT Comments 060911 doc Jun 9 '11 Revision Request Comments
075NOGRR-03 OWG Report 061511 doc Jun 17 '11 Committee Report
075NOGRR-04 OWG Report 072011 doc Jul 25 '11 Committee Report
075NOGRR-05 ROS Report 081111 doc Aug 15 '11 Committee Report
Meetings That Took It Up 5
DateMeetingCommitteeStatus
Sep 1 '11 TAC Meeting TAC Concluded
Aug 17 '11 Operations Working Group (OWG) Meeting OWG Concluded
Aug 11 '11 ROS Meeting ROS Concluded
Jul 20 '11 Operations Working Group (OWG) Meeting OWG Concluded
Jun 15 '11 Operations Working Group (OWG) Meeting OWG Concluded