NOGRR #75 · Revision Request
NOGRR075 Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI
ReasonTo synchronize the Nodal Operating Guides with NPRR363.
Created2011-06-15
Rejected2011-08-11
Sections Affected
4.5.3.3
Summary
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI, which adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B.
Action Log 3 milestones
-
Jun 15
OWGDeferred/Tabled→ OWG Language Consideration
-
Jul 20
OWGRecommended for Rejection→ ROS Consideration
-
Aug 11
ROSRejected
Documents 5
| Name | Type | Posted | Classification |
|---|---|---|---|
| 075NOGRR-01 Synchronization with NPRR363, Revision to EEA Level | doc | May 18 '11 | Revision Request |
| 075NOGRR-02 ERCOT Comments 060911 | doc | Jun 9 '11 | Revision Request Comments |
| 075NOGRR-03 OWG Report 061511 | doc | Jun 17 '11 | Committee Report |
| 075NOGRR-04 OWG Report 072011 | doc | Jul 25 '11 | Committee Report |
| 075NOGRR-05 ROS Report 081111 | doc | Aug 15 '11 | Committee Report |
Meetings That Took It Up 5
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Sep 1 '11 | TAC Meeting | TAC | Concluded |
| Aug 17 '11 | Operations Working Group (OWG) Meeting | OWG | Concluded |
| Aug 11 '11 | ROS Meeting | ROS | Concluded |
| Jul 20 '11 | Operations Working Group (OWG) Meeting | OWG | Concluded |
| Jun 15 '11 | Operations Working Group (OWG) Meeting | OWG | Concluded |