NOGRR #70 · Revision Request

NOGRR070  Synchronization with NPRR356, EEA Changes Related to Dispatch Instructions and BLTs

Approved sponsor ERCOT posted 2011-05-04 ercot.com
ReasonThe changes to the EEA process will allow ERCOT to be more efficient in making Hotline calls to Qualified Scheduling Entities (QSEs).
Created2011-06-15
Sections Affected
4.5.3.14.5.3.24.5.3.3
Summary
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 356, EEA Changes Related to Dispatch Instructions and BLTs, which was approved by the ERCOT Board on August 16, 2011; and which changes the need to issue Dispatch Instructions to suspend any ongoing ERCOT-required generating unit or Resource performance testing and moves the requirement to inquire about the availability of Block Load Transfers (BLTs) from Energy Emergency Alert (EEA) Level 2A to EEA Level 2B.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Jun 15 '11OWG To recommend approval of NOGRR070 as revised by OWG.Passed
Documents 6
NameTypePostedClassification
070NOGRR-01 Synchronization with NPRR356, EEA Changes Related t doc May 6 '11 Revision Request
070NOGRR-02 Impact Analysis 050411 doc May 4 '11 Staff Report
070NOGRR-03 OWG Report 061511 doc Jun 17 '11 Committee Report
070NOGRR-04 OWG Report 072011 doc Jul 25 '11 Committee Report
070NOGRR-05 ROS Report 081111 doc Aug 15 '11 Committee Report
070NOGRR-07 TAC Report 090111 doc Sep 7 '11 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Sep 1 '11 TAC Meeting TAC Concluded
Aug 11 '11 ROS Meeting ROS Concluded
Jul 20 '11 Operations Working Group (OWG) Meeting OWG Concluded
Jun 15 '11 Operations Working Group (OWG) Meeting OWG Concluded