NOGRR #66 · Revision Request

NOGRR066  ERCOT WAN Connection Termination Requirement

Approved sponsor Luminant Energy posted 2011-03-09 ercot.com
ReasonThe requirement to terminate the WAN at the Market Participant’s control center was not specified in the zonal Operating Guide; it is unclear why it was added to the Nodal Operating Guide. For some Market Participants, terminating at the control center would potentially be less secure and less reliable if the control center is remote from the control system servers, applications, and data warehouse in the primary and backup data centers.
Created2011-04-20
Sections Affected
7.1.2
Summary
This Nodal Operating Guide Revision Request (NOGRR) deletes the requirement to terminate the Wide Area Network (WAN) connection at the Market Participant’s control center.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Apr 20 '11OWG Consensus to recommend approval of NOGRR066 as amended by the 4/12/11 ERCOT comments and as revised by OWG.Passed
May 18 '11OWG Consensus to endorse and forward the 4/20/11 OWG Report as revised by OWG and Impact Analysis for NOGRR066 to ROS.Passed
Documents 7
NameTypePostedClassification
066NOGRR-01 ERCOT WAN Connection Termination Requirement 030911 doc Mar 9 '11 Revision Request
066NOGRR-02 ERCOT Comments 041211 doc Apr 12 '11 Revision Request Comments
066NOGRR-03 OWG Report 042011 doc Apr 22 '11 Committee Report
066NOGRR-04 Impact Analysis 051211 doc May 12 '11 Committee Report
066NOGRR-05 OWG Report 051811 doc May 20 '11 Committee Report
066NOGRR-06 ROS Report 061611 doc Jun 20 '11 Committee Report
066NOGRR-07 TAC Report 070711 doc Jul 7 '11 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Jul 7 '11 TAC Meeting TAC Concluded
Jun 16 '11 ROS Meeting ROS Concluded
May 18 '11 Operations Working Group (OWG) Meeting OWG Concluded
Apr 20 '11 OWG Meeting OWG Concluded