NOGRR #32 · Revision Request
NOGRR032 Use of Consistent Rating Terminology
ReasonCurrently there are three defined ratings in the Nodal Protocols: Normal Rating, Emergency Rating, and 15-Minute Rating. Requirements for use of the three ratings are contained throughout the Nodal Protocols. In the Nodal Operating Guides there are three defined ratings: Continuous Rating, Emergency Rating, and 15-Minute Rating. Requirements for the use of these ratings are contained throughout the Nodal Operating Guides and are Nodal Operating Guide embodiments of the Nodal Protocol requirements for Normal Rating, Emergency Rating, and 15-Minute Rating, respectively. Additionally, there is a distinction between Transmission Facility and Transmission Element as it pertains to the Ratings definition. The use of the term Transmission Facility is more encompassing than the term Transmission Element. Per the Nodal Protocols, Ratings pertain to Transmission Elements. This NOGRR proposes a corresponding revision to the Nodal Operating Guides.
Created2010-01-18
Sections Affected
3.9.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) proposes language changes to align rating terminology in the Nodal Operating Guides with the terminology in the Nodal Protocols. Utilization of the same verbiage helps alleviate communication issues and also removes the possible interpretation of additional rating requirements.
Action Log 5 milestones
-
Jan 18
OWGDeferred/Tabled→ OWG Language Consideration
-
Feb 19
OWGRecommended for Approval→ OWG IA Review
-
Mar 17
OWGRecommended for Approval→ ROS Consideration
-
Apr 12
ROSRecommended for Approval→ TAC Consideration
-
May 6
TACApproved
Documents 8
| Name | Type | Posted | Classification |
|---|---|---|---|
| 032NOGRR-01 Use of Consistent Rating Terminology 120309 | doc | Dec 3 '09 | Revision Request |
| 032NOGRR-02 CEO Revision Request Review 120309 | doc | Dec 3 '09 | Committee Report |
| 032NOGRR-03 OWG Action Report 011810 | doc | Jan 20 '10 | Committee Report |
| 032NOGRR-04 OWG Recommendation Report 021910 | doc | Feb 22 '10 | Committee Report |
| 032NOGRR-05 Impact Analysis 022410 | doc | Feb 24 '10 | Staff Report |
| 032NOGRR-06 OWG Recommendation Report 031710 | doc | Mar 19 '10 | Committee Report |
| 032NOGRR-07 ROS Recommendation Report 041210 | doc | Apr 14 '10 | Committee Report |
| 032NOGRR-08 TAC Action Report 050610 | doc | May 10 '10 | Committee Report |
Meetings That Took It Up 5
| Date | Meeting | Committee | Status |
|---|---|---|---|
| May 6 '10 | TAC Meeting | TAC | Concluded |
| Apr 12 '10 | ROS Meeting | ROS | Concluded |
| Mar 17 '10 | OWG Meeting | OWG | Concluded |
| Jan 19 '10 | NDSWG Meeting | NDSWG | Concluded |
| Dec 15 '09 | NDSWG Meeting | NDSWG | Concluded |