Approved sponsor John Dumas posted 2009-09-02 ercot.com
ReasonERCOT observed several SPS operations in 2008 that occurred under normal loading without any system disturbances. This NOGRR presented herein places an obligation on Resource owners who have an SPS to monitor fthe flows monitored by the SPS in the base case and reduce output as needed before the arming point of the SPS is reached.
Created2009-10-21
Sections Affected
6.2.1Introduction 6.2.2 Design and Operating Requirements for ERCOT System Facilities
Summary
This Nodal Operating Guide Revision Request (NOGRR) adds addtional monitoring and control requirements for Special Protection Systems (SPSs) that involve generation reduction to synchronize the Nodal Operating Guides with OGRR224.
Action Log 3 milestones
Documents 7
NameTypePostedClassification
029NOGRR-01 Synchronization of OGRR224, Special Protection Syste doc Sep 2 '09 Revision Request
029NOGRR-02 Impact Analysis 090209 doc Sep 2 '09 Staff Report
029NOGRR-03 CEO Revison Request Review 090209 doc Sep 2 '09 Revision Request Comments
029NOGRR-04 OWG Recommendation Report 102109 doc Oct 21 '09 Committee Report
029NOGRR-05 OWG Recommendation Report 111709 doc Nov 18 '09 Committee Report
029NOGRR-06 ROS Recommendation Report 121009 doc Dec 11 '09 Committee Report
029NOGRR-07 TAC Report 010610 doc Jan 8 '10 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Jan 6 '10 TAC Meeting TAC Concluded
Dec 10 '09 ROS Meeting ROS Concluded
Nov 17 '09 OWG Meeting OWG Concluded
Oct 21 '09 OWG Meeting OWG Concluded