NOGRR #26 · Revision Request

NOGRR026  Change the name of Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA) and Synchronization of EEA Steps with Protocols

Approved sponsor Colleen Frosch posted 2009-07-13 ercot.com
ReasonAligns the Nodal Operating Guides with the Nodal Protocols. This NOGRR changes Nodal Operating Guide language only and not procedure.
Created2009-08-19
Sections Affected
1.4Definitions 2.2.1Overview 2.2.9.2Time Synchronization 2.3Ancillary Services 2.6.1Automatic Firm Load Shedding 4.1Introduction 4.2.3Alert 4.4Block Load Transfers between ERCOT and Non-ERCOT System 4.5Emergency Electric Curtailment Plan (EECP) 4.5.1General 4.5.3Implementation 4.5.3.1General Procedures Prior to EECP Operations 4.5.3.2General Procedures During EECP Operations 4.5.3.3EECP Steps 4.5.3.5EECP Termination
Summary
This Nodal Operating Guide Revision Request (NOGRR) changes the name of the Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA), the defined term "Alert" to "Watch", and replaces "BtB" with "DC-Tie". This NOGRR also aligns the EEA Steps in the Nodal Operating Guides with the Nodal Protocols. The NOGRR deletes the definition of "Physical Responsive Capability (PRC)" since this term is already defined in the Nodal Protocols.
Action Log 4 milestones
Documents 7
NameTypePostedClassification
026NOGRR-01 Change the name of Emergency Electric Curtailment doc Jul 13 '09 Revision Request
026NOGRR-02 CEO Revision Request Review 071309 doc Jul 13 '09 Revision Request Comments
026NOGRR-03 Impact Analysis 071309 doc Jul 13 '09 Staff Report
026NOGRR-04 OWG Recommendation Report 081909 doc Aug 20 '09 Committee Report
026NOGRR-05 OWG Recommendation Report 091509 doc Sep 15 '09 Committee Report
026NOGRR-06 ROS Recommendation Report 101509 doc Oct 16 '09 Committee Report
026NOGRR-07 TAC Action Report 110509 doc Nov 5 '09 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Nov 5 '09 TAC Meeting TAC Concluded
Oct 15 '09 ROS Meeting ROS Concluded
Sep 15 '09 OWG Meeting OWG Concluded
Aug 19 '09 OWG Meeting OWG Concluded