LPGRR #12 · Revision Request

LPGRR012  Process for Load Profiling Guide Revisions

Approved sponsor ERCOT posted 2006-05-02 ercot.com
ReasonThe current Change Control Process documented in the Load Profiling Guide is not consistent with Protocol Section 21, Process for Protocol Revision. Consistency with the Protocols and other market guides will simplify and clarify the process, as well as create transparency for all Market Participants.
Created2006-06-27
Sections Affected
Section 2Appendix A
Summary
This revision will replace the current Change Control Process in Section 2, Change Control. Specifically, this LPGRR: Adds an Impact Analysis requirement to Load Profiling Guide Revision Process. Allows the submitter to withdraw a LPGRR only before PWG issues a recommendation. Allows COPS to reject a LPGRR and notify TAC, rather than recommend a rejection to TAC. Clarifies that if PWG cannot reach a consensus on a LPGRR, COPS is required to resolve the issue. Requires ERCOT Board approval of LPGRRs with an ERCOT system or staffing impact. Authorizes ERCOT staff to implement Administrative LPGRRs. Outlines the process to appeal a decision.
Action Log 2 milestones
Documents 4
NameTypePostedClassification
012LPGRR-01 Process for Load Profiling Guide Revisions 050206 doc May 2 '06 Revision Request
012LPGRR-02 Impact Analysis 050406 doc May 4 '06 Staff Report
012LPGRR-03 COPS Recommendation Report 062706 doc Jun 29 '06 Committee Report
012LPGRR-04 TAC Action Report 070606 doc Jul 10 '06 Committee Report
Meetings That Took It Up 2
DateMeetingCommitteeStatus
Jul 6 '06 TAC Meeting TAC Concluded
Jun 27 '06 COPS Meeting COPS Concluded