Meeting · PDCWG
PDCWG Meeting by Webex Only
Revision Requests On The Agenda
Agenda 15 items
- 1. Antitrust Admonition
-
2.
ERCOT Frequency Control Metrics and Regulation Reports
— Li
- PDCWG Frequency Control Report for Nov 20 v2 · Staff Report
- Regulation Analysis Post SCR 773 PDCWG Nov 20 · Staff Report
-
3.
ERCOT Analysis of Disturbances / Frequency Events:
— Gonzalez
- FME Performance of ESRs Carrying RRS 120920 v2 · Staff Report
- Non FMEs for Nov 20 Public · Staff Report
- 4. Texas RE Report — Penney
- 5. Upcoming ERCOT / Texas RE Workshops / Meetings — All
- 6. ERCOT Summary of RFI – combined cycle unit frequency response for high frequency events – Collect PDCWG Response Recommendations to RFI Results — All
- 7. NPRR 1040 – Compliance Metrics for Ancillary Service Supply Responsibility – This NPRR was approved by ROS and referred to PRS (scheduled 12/10) – if there are PDCWG comments, those comments will go directly to PRS — Raymond Lee
- 8. Status updates on PUCT Directives 3 & 9 for Southern Cross DC Tie — Pengwei Du
- 9. Discussion of ERCOT Study Proposal for RRS Limits - — Pengwei Du
-
This topic/study originates from what was OBDRR025 (Withdraw or Modify the Revision?)
- RRS Limits RFP v8.0 · Staff Report
-
Discuss study parameters, timeline
- RRS Limits RFP v8.0 · Staff Report
-
10.
BAL-001-TRE, SAR 12
— Sanchez/Bezzam
- SAR12 BAL 001 TRE 2 120820 · Forms and Templates
- 11. Analysis on ESR frequency response performance (how are the existing batteries performing?) — Gonzalez
- Closed Meeting
- 12. Analysis of QSE Performance During ERCOT Disturbances — Mulholland/All