Meeting · SAWG
SAWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 206
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 15 items
- 1 Antitrust Admonition — I. Haley
- 2 SAWG Leadership Elections — I. Haley
-
3
Update on DG Forecasting: Solar
— C. Stice
- CDR Summer PeakAveSolarCapacityPercentages Summer2019 Load · Staff Report
- CDR Summer PeakAveSolarCapacityPercentages Summer2019 Net Load · Staff Report
- SAWG Meeting Solar PV Discussion 10 31 2019 · Staff Report
-
4
CDR DG Gap Analysis White Paper
— P. Warnken
- 4 DG table v2 · Staff Report
- 5 Probabilistic resource adequacy analysis — P. Warnken
-
6
CDR Supplemental Tab Design Considerations
— P. Warnken
- SAWG Meeting 10 31 2019 CDR Supplemental Tab · Staff Report
-
7
Peak Average Capacity Contributions based on Net Load Hours
— ERCOT
- CDR Summer PeakAveSolarCapacityPercentages Summer2019 Load · Staff Report
- CDR Summer PeakAveSolarCapacityPercentages Summer2019 Net Load · Staff Report
- CDR Summer PeakAveWindCapacityPercentages Summer2019 Load · Staff Report
- CDR Summer PeakAveWindCapacityPercentages Summer2019 Net Load · Staff Report
- SAWG Meeting 10 31 2019 Net Load Capacity Contributions · Staff Report
-
8
Discussion on Using Net Load in Reports
— Chair/Group
- CDR Summer PeakAveSolarCapacityPercentages Summer2019 Net Load · Staff Report
- CDR Summer PeakAveWindCapacityPercentages Summer2019 Net Load · Staff Report
- SAWG Meeting 10 31 2019 Net Load Capacity Contributions · Staff Report
-
9
CONE Study Process Update
— P. Warnken
- CONE LTSA ReserveMargin Study Timelines · Project Documents
- 10 Discussion on Recommendation for Future Methodology used to determine PNM — Chair/Group
-
11
GINR Project Completion Trend Analysis
— D. Mantena
- SAWG Meeting 10 31 2019 COD analysis · Staff Report
- 12 Status of NPRR to Exclude Inactive GINR Projects from the CDR — P. Warnken
- 13 NERC LTRA Update — P. Warnken
- 14 Other Business — Chair
- 15 Adjourn — Chair