Meeting · PWG
PWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 102
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 19 items
- 1. Antitrust Admonition https://www.ercot.com/about/governance/index.html — Leadership
- 2. Introductions, Agenda Review — Leadership
-
3.
Review and Approve September 21, 2015 PWG Meeting Notes
— Leadership
- PWG Mtg Notes 20150921 Draft · Meeting Minutes
- 4. Annual Validation 2015 Update — McKenna
-
5.
LPGRR055 - Extend Load Profile Model Calendar Inputs to 2030
— ERCOT
- AV2015 Update 20151028 · Project Documents
- 6. Protocol Section 18/Load Profiling Guide Review — All
- Review Section 18 homework assignments from September Review AEIC standards as a reference in the LPG PWG Mtg Date Protocol/LPGRR Sections to Cover 05/27/15 18.1, 18.2, 18.2.1 - 18.2.4 06/24/15 18.2.5 - 18.2.10 07/29/15 18.3 - 18.5 08/26/15 18.6 - 18.7 09/21/15 LPG Sections 1-7; 14; 16-19 10/28/15 LPG Sections 1-4, 7, 8.8-8.9, 9-14, Appendices D & E 11/18/15 Continue with LPG review (if needed) 12/11/15 Finalize changes; draft NPRR and LPGRR (if needed)
- PWG Mtg Date Protocol/LPGRR Sections to Cover
- 05/27/15 18.1, 18.2, 18.2.1 - 18.2.4
- 06/24/15 18.2.5 - 18.2.10
- 07/29/15 18.3 - 18.5
- 08/26/15 18.6 - 18.7
-
09/21/15
LPG Sections 1-7; 14; 16-19
- DRAFTXXXNPRR 01 Edits from the 092115 PWG Meeting doc LB.DOC · Revision Request Comments
-
10/28/15
LPG Sections 1-4, 7, 8.8-8.9, 9-14, Appendices D & E
- DRAFTXXXLPGRR 01 Edits from 102815 · Revision Request Comments
- 11/18/15 Continue with LPG review (if needed)
- 12/11/15 Finalize changes; draft NPRR and LPGRR (if needed)
-
7.
Additional issues
— All
- PWG update to COPS 20151014 · Committee Report
- 8. Adjourn
- Next Meeting: November 18; 9:30 am -- 3 pm (MET Center)
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 055LPGRR 22 PWG Comments 10XX15Draft | Revision Request Comments | doc | Oct 21 '15 |
| 055LPGRR 23 PWG Comments 10XX15Draft | zip | Oct 13 '15 |