Meeting · RPG
RPG Meeting by Webex Only
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 8 items
- 1. Antitrust Admonition
- 2. Miscellaneous Update — (ERCOT, 5 mins)
- 3. Steady State Voltage Performance Criteria for GMD Vulnerability Assessments — (ERCOT, 10 mins)
- 4. GMD Vulnerability Assessments Final Results — (ERCOT, 15 mins)
- 5. 2022 Long-Term System Assessment Update — (ERCOT, 20 mins)
- 6. Permian Basin Load Integration Study Status Update — (ERCOT, 20 mins)
- 7. Flat Iron-Barr Ranch-Pegasus South 138 kV Line Project Status Update — (ERCOT, 15 mins)
- 8. Lower Rio Grande Valley (LRGV) System Enhancement Project — (ERCOT, 10 mins)
Documents 6
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 2022 LTSA CurrentTrendsUpdate ScenarioDevelopment 10152021 | Oct 13 '21 | ||
| ERCOT LRGV System Enhancement Project RPG 10152021 final | Oct 13 '21 | ||
| GMDVA Steady State Voltage Criteria October 2021 RPG | Oct 12 '21 | ||
| October2021 RPG GMDVA Final Results | Oct 12 '21 | ||
| Oncor Flat Iron Barr Ranch Pegasus South 138 kV Line Project Oct 15 RPG | Oct 14 '21 | ||
| Permian Basin Load Interconnection Study Final Update Oct2021RPG | Oct 13 '21 |