Meeting · LFLTF
LFLTF Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room A, B and C
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 17 items
- 1. Welcome and Antitrust Admonition — Bill Blevins
-
2.
Update on Interconnection Queue and Upcoming RFI
— Agee Springer
- LARGE LOAD SURVEY for SSO · Forms and Templates
- 3. Issues List Review
-
Definitions –(LFL-4, LFL-5)
— Bob Wittmeyer, Floyd, Shams, Lee Bratcher, Chris Hemschot, Sai Moorty
- Interruptible Load Definition · Revision Request
- DRAFT Definition of Large Flexible Load 091422 · Revision Request
- 092622 LFL Defintions v2 · Stakeholder Presentation
- DRAFT Load Type Matrix Reformated 092622 · Official Guides and Manuals
- Defintion for LFLTF 092622 v2 · Stakeholder Presentation
- LARGE LOAD SURVEY for SSO · Forms and Templates
- Manual Load Shed Obligations - (LFL-34, LFL-38) — Martha Henson
- Ops – TDSP Concerns
- Ops – Reliability Requirements for LFLs – ramp rate and voltage ride-through – (LFL-32, LFL-47) — Jeff Billo
-
Ops – Others
- LFL Ops 9-11-22 Update · Project Documents
- Planning – CDR White Paper – (LFL-49) — Evan Neel
-
Planning – Planning Studies
— Jonathan Rose
- LARGE LOAD SURVEY for SSO · Forms and Templates
- Planning – SSWG Cases — Bill Blevins
- Planning – LFL Interconnection timeline — Chris Hemschot
- Planning – Others
- Markets – TBD
- 4. Discussion Schedule for Issues List at future LFLTF meetings — Bill Blevins
- 5. Update on NPRRs/PGRRs/OBDs
- 6. Adjourn