Revision Requests On The Agenda
Agenda 9 items
- 1. Antitrust Admonition — Bob Wittmeyer (Longhorn Power) · 9:30 am
-
2.
Study Scope: Effectiveness of Transmission in Terms of Load Loss Reduction
— Sun Wook Kang (ERCOT)
· 9:35 am
- Status Update_Effectiveness of Transmission Upgrades - Load Loss · Staff Report
- PGRR-Explanatory-Comments_LLWG-Meeting_Sept.-19-2025 (6) · Revision Request Comments
-
3.
Status Update: Evaluation of VRT Requirement Proposed by ERCOT
— Sun Wook Kang (ERCOT)
· 10:00 am
- Interim LEL VRT assessment process_LLWG_09192025_revised · Project Documents
- Status Update_Evaluation of Voltage Ride Through Requirement Proposal · Project Documents
- 4. Verbal Update: Large Load Model Survey — Sun Wook Kang (ERCOT) · 10:20 am
-
5.
LL Frequency Limit Study Update
— Luis Hinojosa (ERCOT)
· 10:30 am
- LLWG_Frequency_Limit_Study_Update_09192025 1 · Staff Report
-
6.
Far West Texas IROL
— Freddy Garcia (ERCOT)
· 10:50 am
- Far West ROS_V2.potx · Stakeholder Presentation
-
7.
Interconnection Studies for CLRs
— Samuel Brandin (Agentic)
· 11:20 am
- CLR-Planning-Ahead-of-NPRR1188-Implementation-v0 (4)(contact info added) · Revision Request
- CLR Planning Benefits PGRR - Agentic Infrastructure - 9.19.25 vf (1) · Stakeholder Presentation
-
8.
Load Cluster Study Concepts
— Clayton Greer (Cholla)
· 11:40 am
- LLWG 091925 Cluster Study Presentation · Stakeholder Presentation
- 9. Adjourn · 12:00 pm