Meeting · RPG
RPG Meeting by Webex Only
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 7 items
- 1. Antitrust Admonition
- 2. Miscellaneous Update — (ERCOT, 10 min)
- 3. BOLD Low Impedance Line Design — (AEP, 30 min)
-
4.
2021 RTP Reliability Sensitivity Analysis-Status Update
— (ERCOT, 15 min)
- 2021 RTP Off Peak Sensitivity Analysis September 2021 RPG · Staff Report
- 5. Flat Iron-Barr Ranch-Pegasus South 138 kV Line Project-Status Update — (ERCOT, 15 min)
- 6. South Texas Assessment-Lower Rio Grande Valley (LRGV) System Enhancement Project — (ERCOT, 40 min)
- 7. Long Term West Texas Stability Assessment — (ERCOT, 30 min)
Documents 5
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 2021 RTP Economic Analysis Renewable Generation Penetration September 2021 RPG | Sep 13 '21 | ||
| ERCOT LRGV System Enhancement Project RPG 09152021 final | Sep 14 '21 | ||
| Oncor Flat Iron Barr Ranch Pegasus South 138 kV Line Project Sept 15 RPG | Sep 9 '21 | ||
| RPG 09 2021 Long Term West Texas Export Study Update | Sep 15 '21 | ||
| SPECIAL ERCOT RPG Mtg, 2021 0915 BOLD Low Impedance Line Design vF | Sep 13 '21 |