Meeting · MWG
MWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 206A
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 19 items
- 1. Anti-Trust admonition/disclaimer — D. Sumbera · 9:30 – 9:35
- 2. Attendance roll-call and introduction — D. Sumbera · 9:35 – 9:45
-
3.
MWG 5/16/2018 Action Item 3 follow up - Review TDSPs’ long term plan for EPS meter communications
— D. Tucker
· 9:45 – 10:15
- EPS Meter communications TDSP summarized responses · Staff Report
-
4.
MWG 5/16/2018 Action Item 3 follow up- Discuss ERCOT wide future EPS meter communications options
— All
· 10:15 – 11:30
- EPS Meter communications TDSP summarized responses · Staff Report
- Lunch (not provided) · 11:30 – 13:00
- 5. MWG 5/16/2018 – ERCOT follow up items: — H. Perez/ · 13:00 – 13:45
-
1. Confirmation of receipt for access notifications
— S. Nuckolls
- MWG presentation 8 29 2018 item 5 · Staff Report
-
2. Use of temporary exemption process for generation sites in the network model where the site is not energized/meter installation pending
- MWG presentation 8 29 2018 item 5 · Staff Report
-
3. Site certification documents being returned via email – NPRR required
- EPS Metering Facility Site Certification Form Ver 4.0 · Forms and Templates
- EPSMeteringFacilitySiteCertificationForm Ver3 1 REDLINE · Forms and Templates
- MWG presentation 8 29 2018 item 5 · Staff Report
- 6. Option for removal of signature on the following forms — D. Maul · 13:45 – 14:00
-
EPS Meter Test Report
- ERCOT Meter Test Report Ver 5.0 · Forms and Templates
- ERCOT Meter Test Report Ver4 1 REDLINE · Forms and Templates
-
EPS Site Certification Form
- EPS Metering Facility Site Certification Form Ver 4.0 · Forms and Templates
- EPSMeteringFacilitySiteCertificationForm Ver3 1 REDLINE · Forms and Templates
- 7. MWG 5/16/2018 Action Item 5 follow up - Discussion of metering configurations utilizing voltage throw-over relays — D. Sumbera/ All · 14:00 – 14:45
- Break · 14:45 – 15:00
-
8.
Reports on EPS metering activities
— D. Tucker
· 15:00 – 15:15
- Reporting on statistics for EPS meter activity Aug2018 · Staff Report
- 9. Telemetry to EPS Meter Mapping — D. Tucker · 15:15 – 15:30
- 10. New or other business items — D. Sumbera · 15:30 – 15:45
- 11. Meeting summary and closing remarks — D. Sumbera · 15:45 – 16:00
- End of meeting · 16:00
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| MWG Agenda August 29 2018 final | Meeting Agenda | doc | Aug 22 '18 |
| MWG Meeting Notes 8 29 2018 final | Meeting Minutes | docx | Aug 30 '18 |