1.
Overview of wind generation technologies
— R. Sims
· 9:00 a.m.
- 1-Workshop-WindPrimer101-rev2 · Stakeholder Presentation
- 2. Physical design / capability of 3 specific wind generators representing a range of technologies: — R. Sims J. Franklin M. Barrios
-
(20 minutes per presentation) a. Describe the turbine i. Physical characteristics ii. Rating iii. Method of starting iv. Method of controlling power output v. Method of stopping vi. Reactive devices as part of the turbine 1. Physical description 2. How used operationally b. Describe the wind ranch i. Site selection criteria ii. Cabling connecting to collector substation 1. Electrical characteristics 2. Operational issues iii. Substation 1. Substation / switching diagram 2. Step up transformer(s) 3. Reactive devices iv. Control system 1. Location of control rooms / facilities 2. SCADA 3. Turbine power control 4. Reactive control 5. Switch / breaker control c. Transmission interconnection issues i. Special Protection Schemes (SPSs) ii. Remedial Action Plans (RAPs) iii. Describe current Voltage Ride Through capability 1. What are current low voltage relay settings 2. What design changes would be required and what would it cost to comply with FERC 661A nine cycle zero volt standard
- 2a-workshop-Sims-operations-Rev2 · Stakeholder Presentation
- 2a-Workshop-Sims-Operationsabridged · Stakeholder Presentation
- 2b-workshop-EON-Operations · Stakeholder Presentation
- 2c-Workshop-FPL-Operations · Stakeholder Presentation
- 3a-workshop-AES-operations-part2 · Stakeholder Presentation
- 4. Lunch
-
5.
ERCOT voltage control requirements (15 minutes)
— ERCOT
- 5-Workshop-ERCOT-Voltage_Control_Requirements-Rev2 · Staff Report
-
6.
Transmission Owner voltage management practices (25 minutes)
— Oncor
- 6-Workshop-Oncor-onVoltage · Stakeholder Presentation
-
7.
ERCOT Operational Proposals a. Utilizing High Frequency Relaying to protect against sudden increases in wind output b. Special Protection System (SPS) Operation c. Weather data input requirements for the wind forecast d. Ramp Rate discussion i. Explore the possibility of wind generation providing governor-like response ii. Explore the possibility of a ramp rate instruction
— ERCOT
- 7-Workshop-ERCOT-WindGenerationOperationalIssuesRisks · Staff Report
- 8. Next steps a. Identify training needs i. For wind generators and QSEs ii. For ERCOT staff b. Identify procedural changes to be made i. Data collection ii. Operating procedures iii. Equipment design
- ∙ ∙ ∙ ∙ ∙ $FREE See https://www.ercot.com/calendar/2008/08/20080822-WIND for more info, or contact Walter Reid, John Dumas, or Mark Garrett. Presentations will be posted to the calendar page prior to the meeting. Conference call lines (40) will be available. Rev 8/13. Topics subject to slight change. · 5:00 p.m.
Documents 1
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| Second Wind Generation Workshop Aug 22 | Meeting Agenda | doc | Aug 20 '08 |