Meeting · RPG
RPG Meeting by Webex Only
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 10 items
- 1. Antitrust Admonition
- 2. Miscellaneous Updates — (ERCOT, 10 min)
- 3. Corpus Christi Reactive Needs and Projects — (AEP, 15 min)
- 4. 2021 Regional Transmission Plan (RTP) Economic Analysis Update — (ERCOT, 15 min)
- 5. 2021 RTP Reliability Sensitivity Analysis Update — (ERCOT, 15 min)
- 6. 2022 Long Term System Assessment (LTSA) Update — (ERCOT, 20 min)
- 7. RPG-Port Lavaca Area Improvement Project–Status Update — (ERCOT, 15 min)
- 8. RPG-Flat Iron-Barr Ranch-Pegasus South 138 kV Line Project-Status Update — (ERCOT, 15 min)
- 9. RPG-Nacogdoches Southeast Switch-Redland Switch-Lufkin 345 kV Loop Project-Status Update — (ERCOT, 15 min)
- 10. Permian Basin Load Integration Study-Status Update — (ERCOT, 15 min)
Documents 9
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 2021 RTP Economic Analysis Initial Results August 2021 RPG | Aug 13 '21 | ||
| 2021 RTP Sensitivity Analysis August 2021 RPG | Aug 13 '21 | ||
| 2022 LTSA Update InputAssumptions August2021 | Aug 12 '21 | ||
| AEPSC Corpus North Shore reactive study v2 | Aug 16 '21 | ||
| AEPSC Port Lavaca Area Improvement Project Status Update Aug 17 RPG | Aug 11 '21 | ||
| Draft 2021 RTP Scope and Process v3 | Aug 16 '21 | ||
| ERCOT EIR Oncor Nacogdoches Lufkin 081721 Status | Aug 16 '21 | ||
| Oncor Flat Iron Barr Ranch Pegasus South 138 kV Line Project August 17 RPG | Aug 16 '21 | ||
| Permian Basin Load Interconnection Study Status Update Aug2021RPG | Aug 12 '21 |