Meeting · RPG
RPG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 MET Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 19 items
- 1. Antitrust Admonition · 9:30 a.m.
- 2. Miscellaneous Updates — ERCOT · 9:35 a.m.
-
3.
EIR Status Update – 26RPG007 BEC Cooke County Resiliency Project
— ERCOT
· 9:40 a.m.
- 3. EIR_BEC_Cooke_County_Resiliency_Project_Status_Update_RPG_July_2026_FINAL_v2 · Project Documents
- 4. EIR Status Update – 26RPG004 AEPSC Laredo Area Upgrade Project — ERCOT · 9:50 a.m.
-
5.
EIR Status Update – 25RPG009 Oncor and LCRA TSC Muscovy and Voss Lake 345/138-kV Project (Phase 2)
— ERCOT
· 10:00 a.m.
- 5. EIR_StatusUpdate_Oncor and LCRA TSC -Muscovy VossLake_Phase2_July2026_RPG · Project Documents
- 6. EIR Status Update – Combined 25RPG020 CPS Energy Large Load Additions Project & 25RPG046 STEC Medina County Large Load Additions Project — ERCOT · 10:10 a.m.
-
7.
EIR Status Update – 25RPG037 LP&L West Loop Project
— ERCOT
· 10:20 a.m.
- 7. EIR_LPL_West_Loop_Project_Status_Update_RPG_July_2026_FINAL · Project Documents
-
8.
EIR Status Update – 26RPG005 DME Denton Area Transmission Improvements Project
— ERCOT
· 10:30 a.m.
- 8. EIR_DME_Denton Area_Transmission_Improvement_Status_Update · Project Documents
- 9. EIR Status Update – 26RPG017 TNMP Climax to Bells Area Transmission System Improvements Project — ERCOT · 10:40 a.m.
- 10. EIR Status Update – 26RPG018 PEC Liberty Hill Area Capacity Improvement Project — ERCOT · 10:50 a.m.
-
11.
26RPG008 AEPSC Panhandle Project Overview
— AEPSC
· 11:00 a.m.
- 11. Panhandle RPG overview_v1 · Project Documents
- 12. 26RPG016 CTT Panhandle Reliability Transmission Plan Project Overview — CTT · 11:10 a.m.
- 13. ERCOT Independent Review Scope: Combined 26RPG008 AEPSC Panhandle Project & 26RPG016 CTT Panhandle Reliability Transmission Plan Project — ERCOT · 11:20 a.m.
-
14.
26RPG009 AEPSC Rio Grande Valley System Improvement Project Overview
— AEPSC
· 11:30 a.m.
- 14. AEPSC RGV System Improvements 26RPG009 OVERVIEW · Stakeholder Presentation
- 15. ERCOT Independent Review Scope: 26RPG009 AEPSC Rio Grande Valley System Improvement Project — ERCOT · 11:40 a.m.
-
16.
26RPG022 AEN Dunlap to Decker 138-kV Line Project Overview
— AEN
· 11:50 a.m.
- 16. 26RPG022 AEN Dunlap to Decker 138-kV Line Project Overview · Project Documents
-
17.
ERCOT Independent Review Scope: 26RPG022 AEN Dunlap to Decker 138-kV Line Project
— ERCOT
· 12:00 p.m.
- 17. EIR_Scope_26RPG022 AEN Dunlap to Decker 138-kV Line Project_Final · Project Documents
-
18.
Batch Zero Interconnection Study Scope
— ERCOT
· 12:10 p.m.
- 18. Batch_Zero_Interconnection_Study_Scope_RPG_July_2026 · Project Documents
- 19. Adjourn — ERCOT · 12:30 p.m.