Meeting · PDCWG
PDCWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room B
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 16 items
- 1. Antitrust Admonition · 9:30 a.m.
- 2. FFR Advancement/ECRS Update — Mago · 9:35 a.m.
- 3. NPRR 1128 — Siddiqi · 9:45 a.m.
-
Allow FFR Procurement up to FFR Limit Without Proration
- NPRR 1128 June PDCWG Discussion v0 · Stakeholder Presentation
- 4. Follow up from previous PDCWG discussion — Siddiqi · 10:05 am.
- When not providing RRS or Regulation: All Resources (incl ESRs and CLRs) should have same min PFR ramp rate (based on slowest GR PFR ramp rate), +/-36 mHz frequency deadband, and max 5% droop.
- When providing RRS or Regulation: Resources (including CLRs?) have the option to provide RRS-PFR in one of the following ways (with droop setting tied to % of HSL that wants to provide RRS-PFR):
- +/-17 mHz frequency deadband with min PFR ramp rate as in (1) above, or
- +/-36 mHz frequency deadband with PFR MW amount provided in 0.5 seconds
- For CLRs only: +/-36 mHz frequency deadband (already in place I believe) and PFR ramp rate as in (1) above.
-
5.
ERCOT Frequency Control Metrics and Regulation Reports
— Li/Gari
· 10:30 a.m.
- Regulation Analysis Post SCR 773_PDCWG_May_2022 · Staff Report
- PDCWG Frequency Control Report for May 2022 · Committee Report
- 6. ERCOT Analysis of Disturbances / Frequency Events: — Gari · 10:45 a.m.
-
Non-FMEs
- Non-FMEs for May-22_PUBLIC_v4 · Staff Report
- FME
- 7. TRE Report — Penney · 11:05 a.m.
- 8. Adjourn · 11:10 a.m.
Documents 1
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| Intro_FFRA_ECRS_Projects_06152022_v0 | Project Documents | pptx | Jun 15 '22 |