Meeting · RPG
RPG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Rooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 14 items
- 1. Antitrust Admonition · 9:30 a.m.
- 2. Miscellaneous Updates — ERCOT · 9:35 a.m.
- 3. EIR Status Update – Eastside 345/138-kV Switching Station Project — ERCOT · 9:40 a.m.
- 4. EIR Status Update – Omicron Reliability Project — ERCOT · 10:00 a.m.
- 5. EIR Status Update – Temple Area Project — ERCOT · 10:20 a.m.
- 6. EIR Status Update – Canton Area Loop Project — ERCOT · 10:40 a.m.
- 7. Brownsville Area Improvements Transmission Project Overview — AEPSC · 11:00 a.m.
- 8. ERCOT Independent Review Scope: Brownsville Area Improvements Transmission Project — ERCOT · 11:20 a.m.
- 9. ERCOT Independent Review Scope: Rand Area Loop Project — ERCOT · 11:40 a.m.
- 10. ERCOT Status Update – Permian Basin Reliability Plan Study — ERCOT · 12:00 p.m.
- 11. 2024 LTSA High Load Growth and Environmental Regulations Scenario Preliminary Capacity Expansion Results — ERCOT · 12:30 p.m.
- 12. 2024 Grid Reliability and Resiliency Assessment Scope — ERCOT · 12:50 p.m.
- 13. ERCOT Extra-High Voltage Infrastructure Introduction — ERCOT · 1:10 p.m.
- 14. Adjourn — Presenter · 1:30 p.m.
Documents 10
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| EIR - Brownsville Area Improvement Scope June 2024 | Jun 5 '24 | ||
| 2024 Long-Term System Assessment (LTSA) High Load Growth Scenario June 11, 2024 | Jun 7 '24 | ||
| EIR REC - Rayburn Electric Cooperative Canton Loop - Status Update RPG June 2024 | Jun 7 '24 | ||
| EIR - CPS - Eastside 345_138-kV Switching Station Project - RPG Jun 2024 | Jun 7 '24 | ||
| EIR - REC - Rand Area Loop Project - Scope - RPG Jun 2024 | Jun 7 '24 | ||
| Permian Basin Reliability Plan Study - Status Update - June 2024 RPG | Jun 7 '24 | ||
| EIR Oncor - Temple Area Project - Status Update - RPG June 2024 | Jun 10 '24 | ||
| EIR CPS Omicron Reliability Project Status Update RPG June 2024 | Jun 10 '24 | ||
| ERCOT EHV Infrastructure Initiative Introduction June 2024 RPG | Jun 10 '24 | ||
| 2024 Reliability and Resiliency Assessment Scope June 2024 RGP | Jun 10 '24 |