Meeting · CMWG
Congestion Management Working Group Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 206
Agenda 5 items
- 1. Open Meeting/ Anti-Trust Admonition — Ward/Wagner · 9:30-9:35
-
2.
CCT Model Design a. Do we need the same topology for CRR auction and CCT? b. Should outages be considered in annual or monthly CCT? c. How hard is it to get outage information into the CCT tool? Does the input file flow from the CRR process or is there another process that integrates the NMMS info with the Outage Scheduler info? d. Activity flow chart of the timing of development of the model/case e. Verify that it will be possible to use the 12 monthly CRR models (w/o outages) for Annual CCT test. (or figure out that this will not work) What is the set of constraints (contingency / monitored element pair) associated with the existing CSCs and CREs? How will generic constraints (voltage, stability limits, area import constraints) be modeled in the CCT? Does disaggregation work? How will monthly on peak wind output be developed? Will this be developed for each wind location and turned into an HSL for the resource? Discussion of ongoing process for controlling entity validation.
— ERCOT
· 9:35-11:45
- 2008 CSC Analysis Info · Staff Report
- CCT process timeline · Project Documents
- CCTTimelineWhitePaperNew050608
- Methodology_CalculatingWindPgenforSSWGcases-draft200805 · Official Guides and Manuals
- 3. Lunch · 11:45 - 1
-
4.
CCT Carry-Over Items from morning SP Cap Discussions Discuss updated white paper of proposed ERCOT methodology. Comments to be returned by 5/19 for discussion at 5/19 meeting.
— ERCOT
· 1-3:15
- Maximum Shadow Price_methodology - Shams comments · Revision Request Comments
- MaximumShadowPrice_methodology · Official Guides and Manuals
- ShadowPrice_wp_comments20080516 · Revision Request Comments
- 5 Review & Next steps — Ward/Wagner · 3:15-3:30