Meeting · RPG
RPG Meeting by Webex Only
Agenda 9 items
- 1. Antitrust Admonition
- 2. Miscellaneous Update
- 3. STEC and LCRA TSC Second Circuit Bakersfield to Big Hill Project — (STEC/LCRA) · 20 min
- 4. AEPSC Port Lavaca Area Improvement-Scope — (ERCOT) · 15 min
- 5. Permian Basin Load Integration Study-Update — (ERCOT) · 10 min
- 6. 2021 Regional Transmission Plan Assumptions-Update — (ERCOT) · 20 min
- 7. 2022 Long-Term System Assessment-Update — (ERCOT) · 15 min
- 8. South Texas Stability Assessment-Update — (ERCOT) · 20 min
- 9. West Texas Export Study-Update — (ERCOT) · 20 min
Documents 7
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 2021RTP AssumptionsUpdate 04062021 | Apr 2 '21 | ||
| 2022 LTSA Planning April2021 | Mar 31 '21 | ||
| AEPSC Port Lavaca Area Improvement Project Scope April 6 RPG Final | Apr 1 '21 | ||
| Bakersfield to Big Hill 345 kV Second Circuit Addition April RPG 2021 | Apr 2 '21 | ||
| Permian Basin Load Interconnection Status Update April2021RPG | Apr 1 '21 | ||
| RPG 04 2021 Long Term West Texas Export Study Update | Apr 2 '21 | ||
| South Texas Stability Assessment Update 04062021 | Apr 2 '21 |