Meeting · MWG
MWG Meeting by Webex only
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 14 items
-
1.
Anti-Trust Admonition and Introduction
— D. Breshears
· 9:00 AM
- Meter Working Group · Stakeholder Presentation
- 2. Selection/Confirmation of Chair/Vice Chair — D. Tucker · 9:05 AM
- 3. NPRR 1100 Discussions — Tesla · 9:10 AM
- 4. EPS Metering Document Exchange Options, other than Email — D. Maul · 10:00 AM
- 5. Line Loss Compensation Language Changes Status — D. Tucker · 10:10 AM
-
6.
Design Proposal Requirements for non-aux Load Netting Configurations
— D. Maul
· 10:20 AM
- 5. Design Proposal 3.1 Redline · Forms and Templates
- 7. Metering Configurations being Proposed for use of Existing Infrastructure to connect Loads and Generation with no Netting — D. Tucker · 10:30 AM
-
8.
Final Update on Voltage Throw-over Schemes related to Black Start
— H. Perez
· 11:15 AM
- 7. Metering Configuration Discussion - Single POI No Netting · Stakeholder Presentation
-
9.
Reports on EPS Activities
— S. Nuckolls D. Maul
· 11:25 AM
- 9. Reports on EPS meter activities January 2022 · Staff Report
-
10.
Progress Report on NPRR949 Implementation. IP required by 1/1/2023.
— S. Nuckolls
· 11:45 AM
- 10. Progress Report on NPRR949 January 2022 · Project Documents
- 11. New or other Business Items — D. Breshears · 11:55 AM
- 12. Meeting Summary and Closing Remarks — D. Breshears · 12:00 PM
- End of Meeting
- Deferred Open Action Items List Design Proposal Update to Remove RARF
Documents 3
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| MWG Agenda | Meeting Agenda | doc | Jan 13 '22 |
| MWG Meeting Notes 01/27/22 | Meeting Minutes | docx | Feb 1 '22 |
| Telsa Drawing | Stakeholder Presentation | jpg | Feb 1 '22 |