Meeting · LLWG
LLWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 13 items
- 1. Antitrust Admonition — Bob Wittmeyer (Longhorn Power) · 9:30 am
- 2. Election of 2026 LLWG Chair and Vice Chair — Bob Wittmeyer (Longhorn Power) · 9:35 am
-
3.
LLI Batch Study Process
— Jeff Billo (ERCOT)
· 9:40 am
- Batch Zero Loads Presentation · Stakeholder Presentation
- ERCOT Large Load Batch Studies LLWG_01222026 · Third Party Study
- 4. Status Update: Evaluation of Voltage Ride Through Requirement — Sun Wook Kang (ERCOT) · 10:40 am
- 5. Progress Update: LEL SSO and Power Variation Criteria — Jimmy Zhang & Jonathan Rose (ERCOT) · 11:15 am
- 6. Lunch · 12:00 pm
-
7.
NOGRR 282 – Tesla Comments
— Sean Jones (Tesla)
· 1:00 pm
- LL RRs TAC Jan 2026 Final Clean 1-19-26 · Project Documents
-
8.
NOGRR 282 – ERCOT Comments and Update
— Patrick Gravois (ERCOT)
· 1:20 pm
- LL RRs TAC Jan 2026 Final Clean 1-19-26 · Project Documents
-
9.
PGRR 141 – Large Load Interconnection Study Reform
— Evan Neel (Lancium)Chris Matos (Google)
· 1:50 pm
- 141PGRR-01-Large-Load-Interconnection-Study-Reform-for-Substantiated-Load-123125 · Revision Request
- LL RRs TAC Jan 2026 Final Clean 1-19-26 · Project Documents
- 10. Powering the AI Revolution Without Breaking the Grid — Ratnesh Sharma & Singh Surinder (Relyion Energy Inc.) · 2:15 pm
-
11.
Considerations for Large Electronic Load Ride-Through
— Brett Ross (PNNL)
· 2:45 pm
- Considerations for Electronic Load Ride-Through · Third Party Study
- 12. Technical Question and Comment — Mike Tabrizi (Zero-Emission Grid LLC) · 3:30 pm
- Adjourn · 4:00 pm
Documents 1
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| RelyionEnergy_ERCOT vf_with Video | Stakeholder Presentation | pptx | Jan 21 '26 |