Meeting · LLWG
LLWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 13 items
- 1. Antitrust Admonition — Bob Wittmeyer (Longhorn Power) · 9:30 am
- 2. Election of 2026 LLWG Chair and Vice Chair — Bob Wittmeyer (Longhorn Power) · 9:35 am
-
3.
LLI Batch Study Process
— Jeff Billo (ERCOT)
· 9:40 am
- ERCOT Large Load Batch Studies LLWG_01222026 · Third Party Study
- Batch Zero Loads Presentation · Stakeholder Presentation
-
4.
Status Update: Evaluation of Voltage Ride Through Requirement
— Sun Wook Kang (ERCOT)
· 10:40 am
- LL RRs TAC Jan 2026 Final Clean 1-19-26 · Project Documents
- Status Update_Evaluation of Voltage Ride Through Requirement - Jan 2026 LLWG · Project Documents
-
5.
Progress Update: LEL SSO and Power Variation Criteria
— Jimmy Zhang & Jonathan Rose (ERCOT)
· 11:15 am
- ERCOT_Electranix LEL SSO Power Variation Criteria_LLWG 20260122 post · Stakeholder Presentation
- 6. Lunch · 12:00 pm
-
7.
NOGRR 282 – Tesla Comments
— Sean Jones (Tesla)
· 1:00 pm
- RelyionEnergy_ERCOT vf_with Video · Stakeholder Presentation
-
8.
NOGRR 282 – ERCOT Comments and Update
— Patrick Gravois (ERCOT)
· 1:20 pm
- Tesla comments _ ERCOT VRT _ LLWG_1.22.26 · Revision Request Comments
- 9. PGRR 141 – Large Load Interconnection Study Reform — Evan Neel (Lancium)Chris Matos (Google) · 1:50 pm
-
10.
Powering the AI Revolution Without Breaking the Grid
— Ratnesh Sharma & Singh Surinder (Relyion Energy Inc.)
· 2:15 pm
- ZEG_ERCOT_LLWG_January_22_2026 · Meeting Minutes
-
11.
Considerations for Large Electronic Load Ride-Through
— Brett Ross (PNNL)
· 2:45 pm
- Considerations for Electronic Load Ride-Through · Third Party Study
- 12. Technical Question and Comment — Mike Tabrizi (Zero-Emission Grid LLC) · 3:30 pm
- Adjourn · 4:00 pm