Meeting · RPG
RPG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 MET Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Agenda 16 items
- 1. Antitrust Admonition · 9:30 a.m.
- 2. Miscellaneous Updates — ERCOT · 9:35 a.m.
-
3.
EIR Status Update – Skyview 345/138-kV Switch Project
— ERCOT
· 9:40 a.m.
- EIR_Status_Update_Oncor_Skyview_345138kV_Switch_Project_-_RPG_Jan_2026_Final · Project Documents
- 4. EIR Status Update – Southern DFW Load Interconnection and General Grid Strengthening Project — ERCOT · 9:50 a.m.
- 5. EIR Status Update – P.H. Robinson to W.A. Parish 345-kV Hardening Project — ERCOT · 10:00 a.m.
- 6. EIR Status Update – Paris Switch to Monticello Switch 345-kV Line Rebuild Project — ERCOT · 10:10 a.m.
-
7.
EIR Status Update – Muscovy and Voss Lake 345/138-kV Project
— ERCOT
· 10:20 a.m.
- EIR - Oncor and LCRA TSC -Muscovy Voss _StatusUpdate_January2026_RPG · Project Documents
-
8.
EIR Status Update – Nueces Green Ammonia Load Interconnection Project
— ERCOT
· 10:30 a.m.
- EIR_STEC_Nueces_Green_Ammonia_Project_Status_Update_RPG_January_2026_FINAL · Project Documents
- 9. EIR Status Update – Combined CPS Energy Reactive Power Planning Project & CPS Energy Helotes 345/138-kV Switching Station and Autotransformer Addition at Eastside Switching Station Project — ERCOT · 10:40 a.m.
-
10.
West Loop Project Overview
— LP&L
· 10:50 a.m.
- LP&L West Loop Project Overview_v2 · Project Documents
-
11.
ERCOT Independent Review Scope: West Loop Project
— ERCOT
· 11:00 a.m.
- EIR_LPL_West_Loop_Project_Scope_RPG_January_2026_FINAL · Project Documents
-
12.
Set 1, Set 2 and Navarro and Ellis Area Reliability Project Overviews
— Oncor
· 11:10 a.m.
- Set 1 Set 2 and Navarro and Ellis Area Reliability Project Overviews 01162026_Final · Stakeholder Presentation
-
13.
Southeast Brownsville Large Load Transmission System Improvements Project Overview
— STEC
· 11:30 a.m.
- STEC_Southeast Brownsville Load _RPG_final · Stakeholder Presentation
-
14.
2025 RTP Economic Study Results
— ERCOT
· 11:40 a.m.
- 2025 RTP Economic Study Results · Staff Report
-
15.
2025 RTP Final Update
— ERCOT
· 12:10 p.m.
- 2025_RTP_Final_Update_January_2026_RPG · Staff Report
- 16. Adjourn — ERCOT · 12:30 p.m.